Worked Example B: Multi-Objective Trade-Off (Energy vs Daylight)
In real architectural design, building envelope choices involve simultaneous compromises: larger windows increase natural daylight, but also increase summer solar heat gain (overheating) and winter heat loss.
This tutorial guides you through configuring a 3-objective Pareto optimization workflow.
ADO-D22 building problem (2–3 objectives) (.gh)91 KB
22 variables, evaluated by the GBR–ANN surrogate trained on the Zorn et al. (2025) dataset. Also the starting point for Examples A and B.
Set the three-objective mode of SH_BenchmarkADO. All files: Demo Definitions.

Figure 1: Complete ADO 3-objective canvas setup: 22 sliders wired into BenchmarkADO, passing through MIN/MAX objectives into SH_Solver.
Tutorial Goal
Optimize the ADO-D22 commercial building across three competing performance criteria:
- Minimize Annual energy demand (
) - Minimize Overheating hours (
) - Maximize Daylight Factor (
)
Step 1: Set Up Mixed Objective Directions
- Place the SH_BenchmarkADO component on the canvas and create the 22 sliders.
- Place three separate SH_Objective components:
- Objective 1: Connect
F1set to Minimize (▼). - Objective 2: Connect
F2set to Minimize (▼). - Objective 3: Connect
F3set to Maximize (▲).
- Objective 1: Connect
- Hold
Shiftwhile dragging to connect all threeSH_Objectiveoutputs into the single F input ofSH_Solver.
Step 2: Configure Solver Settings
- Double-click SH_Solver to open the panel.
- Under the Settings tab:
- Mode: The solver automatically detects multiple objective streams and activates Multi-Objective (MO) mode.
- Algorithm: Select STRIKE-MO (or OSPREY / EAGLE / NSGA-II (SH)).
- FE Budget: Set to
250evaluations. - HV Reference: Leave set to the automatic
Nadir + 1option.

Figure 2: Solver Settings tab in Multi-Objective mode with Nadir+1 hypervolume reference and STRIKE-MO.
Step 3: Run and Explore the Pareto Front
- Switch to the Optimization tab and press Start.
- Notice the real-time Hypervolume (HV) telemetry tracking the expansion of the non-dominated solution boundary.

Figure 3: Multi-objective run in progress displaying hypervolume growth, non-dominated front count (PF), and evaluation rate.
- Once completed, navigate to the Pareto View:
- 2-Objective Trade-Off Curve: Inspect pairwise conflicts with automatic knee-point detection (diamond marker).
- 3-Objective View: Displays the full 3D Pareto cloud colored with the Viridis spectrum to represent the third objective dimension.

Figure 4: 2-Objective Pareto curve with Knee-point marker (diamond).

Figure 5: 3-Objective Pareto cloud with Viridis color spectrum.
Step 4: Reinstate Compromise Designs
- Hover your cursor over points along the Pareto front to read their exact numerical trade-offs in real physical units.
- Click any design point of interest on the plot.
- Click Reinstate.
- The Grasshopper canvas and Rhino 3D viewport immediately update to reflect that specific compromise geometry!
- Click Export CSV to save the entire Pareto archive for project documentation or academic publications.
