Skip to content

ADO-D22 (Daylight & Energy Benchmark) ​

The ADO-D22 benchmark represents an authentic, multi-objective architectural design problem derived from the University of Stuttgart and Transsolar research dataset (Zorn et al., 2025, CC BY 4.0, doi:10.18419/darus-4532).

.GH
ADO-D22 building problem (2–3 objectives) (.gh)91 KB

22 variables, evaluated by the GBR–ANN surrogate trained on the Zorn et al. (2025) dataset. Also the starting point for Examples A and B.

Rhino 8 (Windows) • SilverHawk v0.6.36

Problem Formulation ​

The benchmark models a shoebox office with a south-facing facade and a shading device, and asks for the simultaneous optimization of annual energy demand, summer overheating, and daylight availability.

ADO-D22 Building Architecture
Figure 1: ADO-D22 parametric building model featuring 22 design variables (18 continuous float sliders and 4 binary switches) driving three conflicting building performance objectives.

Problem Specifications ​

SpecificationDetails
Design Variables (D=22)18 continuous (shading geometry, sill height, air-change rate, insulation, among others) + 4 binary (construction choices). The exact list is in the Zorn et al. dataset.
Objectives1. F1: Annual energy demand (Qtot, kWh/m2a) — MIN
2. F2: Overheating hours (Kh) — MIN
3. F3: Daylight factor (DF) — MAX
Original SimulationTRNSYS 18 dynamic building simulation. Too slow for repeated statistical benchmarking directly on the canvas.
Grasshopper EvaluationAmbrosini GBR–ANN Surrogate Models: Embedded natively in C# within the SH_BenchmarkADO component, delivering instantaneous, deterministic evaluations directly on canvas.

The GBR–ANN surrogate models ​

To allow architects and researchers to run rigorous multi-objective solver comparisons directly within Grasshopper without TRNSYS simulation latency, Luciano Ambrosini trained surrogate (emulator) models on ≈104 TRNSYS-simulated designs from the Zorn et al. dataset, combining gradient-boosted regression (GBR) and artificial neural networks (ANN). Cross-validated R2≥0.98; emulator RMSE on energy demand is 2.84 kWh/m2a. The model assignment per objective follows the Benchmark Report.

  • Discrete Variable Handling: Binary switches are mapped to continuous sliders [0.0,1.0] and rounded at evaluation, mirroring standard parametric modeling practice in Grasshopper.

Multi-objective results (hypervolume) ​

The campaign compares 18 configurations at 5,000 evaluations each (population × generations: 20×250, 40×125, 100×50), with 5 runs for tool configurations and 30 for library ones; the surrogate RBFMOpt is limited to 500 evaluations. Quality is measured using the Hypervolume (HV) indicator referenced to Nadir + 1:

ADO-D22 Multi-Objective Hypervolume Boxplot
Figure 2: Hypervolume distributions on the ADO-D22 benchmark (Benchmark Report 2026).

Key findings ​

  1. Top tier. OSPREY and EAGLE form the top tier, statistically inseparable; TALON sits mid-pack. SilverHawk's NSGA-II and NSGA-III trail the canonical implementations, and four NSGA-II implementations alone span up to 6.4% in hypervolume: implementation details matter as much as the algorithm.
  2. Energy target. 14 configurations reach the best energy target within 2.0 kWh/m2a, below the emulator error, so differences at the extreme are not meaningful.
  3. Effective dimension. A Sobol analysis shows an effective dimension of about 12–15 out of 22.
  4. Cost per evaluation changes the answer. SilverHawk solvers cost about 50 ms per evaluation. RBFMOpt at 500 evaluations is ahead per evaluation but takes 2.7 min, versus 2 h 16 min for 2,000 evaluations. With a slow real model (the inclined-column case) the surrogate wins in hypervolume (1.415e8 vs 1.07e8 and 1.04e8): when evaluations are expensive, a surrogate is the right tool. Time-fair and evaluation-fair rankings answer different questions.

How to Run ADO-D22 in SilverHawk ​

  1. Place SH_BenchmarkADO onto your Grasshopper canvas from the Benchmark ribbon.
  2. Right-click the component and select Create / Update Sliders to automatically instantiate all 22 decision variables.
  3. Wire the F1,F2,F3 outputs through SH_Objective components (configured as MIN, MIN, MAX).
  4. Wire the outputs into SH_Solver and select OSPREY (or EAGLE / STRIKE-MO).
  5. Open the solver panel, click Start, and explore the real-time 3D Viridis Pareto front!

References ​

  • Zorn, M., Claus, L., Frenzel, C., & Wortmann, T. (2025). Optimizing an expensive multi-objective building performance problem: benchmarking model-based optimization algorithms against metaheuristics with and without surrogates. Energy and Buildings, 336, 115562. doi:10.1016/j.enbuild.2025.115562
  • Zorn, M., Claus, L., Frenzel, C., & Wortmann, T. (2025). Replication Data for: Optimizing an expensive multi-objective building performance problem. DaRUS Data Repository. doi:10.18419/darus-4532
  • Ambrosini, L. (2026). SilverHawk Benchmark Report 2026: single- and multi-objective optimization in Grasshopper – the complete results of the 2026 benchmark campaigns. Zenodo Technical Report LA-SH-TR-2026-01, v1.0. doi:10.5281/zenodo.23768134
  • Ambrosini, L. (2026). Hybrid metaheuristics for architectural design optimization under small evaluation and wall-clock budgets. arXiv:2610.26202 [cs.NE]. https://arxiv.org/abs/2610.26202